document.writeln(""); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(" "); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln(" "); document.writeln("
该文章免费阅读,以下是该文章的全部内容:<\/span><\/td>"); document.writeln(" <\/tr>"); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln("
  按照县委【2015】第55期《会议纪要》内容精神,1月4日,县旅游委就xxx风景区及xxx大峡谷落实“旅游景区重点项目推进”情况进行督促检查,现将督查情况通报如下:
  一、基本情况
  (一)xxx风景区
  项目共13个。其中:本期督查已按期完成项目1个,即电动公交车已投入试运营,占总项目7.7%欠进度项目3个,占总项目23.1%。分别为:停车场摊点占道经营整顿、出台规范菜谱等、老场部拆迁创建。暂未启动项目9个,占总项目69.2%。分别为:景区废旧供电线路杆线拆除、移动通信管线入地等、停车场智能化升级、循环栈道报批、应急救援指挥中心、采伐计划、土地指标报批、移动基站迁移、增加用电负荷。
  (二)xxx大峡谷
  项目1个。达进度项目1个,即生态停车场征地工作已经结束,涉及22户居民已经就相关赔偿协议签字,下步完成迁坟工作后即交付施工,占总项目100%。xxx镇在此次督查节点,项目实施进度最佳,给下步工作开展打下了坚实基础。
  二、存在问题
  1、进度问题。
  公共服务基础设施项目单位普遍存在重视不够,所涉项目均未实质性介入,甚至没有启动;xxx景区内日常监管项目力度不够,容易开展项目如占道经营、推广菜谱等,反倒未能提前完成。
  2、协调问题。
  所涉报批项目,县各主管部门还需加大协调、沟通力度,有的项目除省、市审批,还要上报到部级,需要专人负责尽快落实。
  三、督查建议
  1、关于进度。
  县委【2015】第55期《会议纪要》总体要求于2016年“五·一”之前完成,强调对所有实施项目进行一周一调度,半月一通报,各项目单位从本节点开始,确立专人牵头监督本单位项目实施进度,排出项目实施进度表,每周向县旅指办上报进度情况。联系电话,邮箱。
  2、协调调度
  xxx镇、xxx镇要发挥牵头和纽带作用,做好相关项目建设的协调、督促和指导工作。旅游委对实施项目一周一调度,半月一通报,确保所有项目在2016年“五·一”  之前完成。<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>");