document.writeln(""); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(" "); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln(" "); document.writeln("
该文章免费阅读,以下是该文章的全部内容:<\/span><\/td>"); document.writeln(" <\/tr>"); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln(" <\/table>"); document.writeln(""); document.writeln(" "); document.writeln(" "); document.writeln("
<\/td>"); document.writeln(" <\/tr>"); document.writeln("

  ****海防堤加固工程可行性研究报告

  ****研究院

  ****年九月

  编写单位:****

  核定:****

  审查:****

  项目负责人:****

  参加人员:****

  目录

  1、综合说明..........................................1

   1.1序言..........................................1

   1.2水文..........................................2

   1.3工程地质..........................................2

   1.4工程任务与规模..........................................2

   1.5工程布置及主要建筑物..........................................3

   1.6施工..........................................3

   1.7投资..........................................3

  2、水文..........................................4

   2.1.自然概况..........................................4

   2.2气象..........................................4

   2.3潮汐..........................................5

   2.4冰情..........................................9

  3、工程地质..........................................10

   3.1地质勘察..........................................10

   3.2地层特征..........................................10

   3.3水文地质..........................................11

   3.4地质构造稳定性..........................................11

   3.5地质评价及结论..........................................11

  4、工程任务与规模..........................................13

   4.1工程建设的必要性与可行性..........................................13

   4.2工程规模..........................................16

  5、工程总布置及主要建筑物..........................................17

   5.1工程等别和标准..........................................17

   5.2堤线确定..........................................17

   5.3总体布置和主要建筑物型式..........................................17

  6、主要建筑物设计..........................................18

   6.1海防堤工程..........................................18

   6.2交通桥..........................................30

  7、工程管理..........................................31

   7.1管理机构规模与人员编制..........................................31

   7.2管理范围与措施..........................................31

  8、施工组织..........................................31

   8.1施工条件..........................................31

   8.2施工方法..........................................32

  9、环境影响评价..........................................34

   9.1加快堤外滩涂淤积..........................................35

   9.2对当地环境的影响..........................................35

   9.3对资源的影响..........................................35

   9.4 对水土保持的影响..........................................35

  10、工程投资估算..........................................36

   10.1工程说明..........................................36

   10.2编制原则..........................................36

   10.3编制依据..........................................36

   10.4投资估算..........................................38

  1.2 水文

  本工程所在区域属北温带季风区海洋性气候,根据****气象站多年观测资料,该地区多年平均降雨量为646.8mm,多年平均蒸发量为1653.6mm,多年平均气温为8.4℃,多年平均风速4.4m/s,多年平均相对湿度为67%;多年平均冻土深度为113cm;多年平均冻冰厚度为25~30cm。

  潮汐属于非正规的混合潮型。平均高潮位1.45m,平均低潮位-2.4m,最高高潮位3.20m,最低低潮位-2.68m。

  1.3 工程地质

  工程场地地质条件,土壤属于盐缄土。主要以淤泥质粉质粘土、粉质粘土和粉土类粉质粘土组成。承载力在60~110Kpa之间。场地土类型为中软性场地土,类别为二类。根据建筑抗震设计规范(GBJ11-89)规定,判别粉土类粉质粘土层为不液化土。

  1.4 工程任务与规模

  本期拟建工程:海防堤3850米,交通桥2座。因为是在原防潮堤的基础上进行加固,不对生态环境构成威胁或破坏。

  1.5 工程布置及主要建筑物

  拟建的****海防堤加固三期工程,堤线确定在1.5m~2.0m高程线上。

  海防堤为梯形断面。海堤顶宽为4.0m,堤顶高程6.14m,迎水坡1:2,背水坡1:2.5,海防堤总长3850m,交通桥布置在0+000和3+850处。每座桥分两跨,每跨长10m,桥宽为5.0m,桥面高程6.0m,渠底高程-0.5m。

  …………  

  10.3.2 取费依据及计算方法

  (1)人工工时的计算依据《水利工程设计概(估)算编制规定》计算。

  (2)材料价格依据当地实际,已运到工地实际价格计入。

  (3)水、电价执行当地实际价格。

  (4)机械台时费依据水利部文件水总[****]116号,《水利工程施工机械台时费定额》计算。

  (5)其他直接费,取直接工程费的5%。

  (6)现场经费:土方工程取直接费的4%,石方工程取直接费的6%,混凝土、模板工程取直接费的6%。

  (7)间接费:土方工程取直接工程费的4%,石方工程取直接工程费的6%,模板工程取直接工程费的6%,混凝土工程取直接工程费4%。

  …………  